Risk Analysis Management System
Create bespoke risk analysis management documents, which include work method statements, for each job making up the maintenance plan.
Task-SSQ0040.


Tel: 0844 800 0506

Stage 6 – Minimising Risk and Strengthening Safe Working Practices (SSQ0040)

Robust safety management is central to our maintenance methodology. Each Maintenance by Global plan incorporates a structured Safety System of Work (SSOW), supported by detailed Risk Assessments, Method Statements and our internally developed Risk Analysis Management Documents (RAMDs).

Because our Safety Officers understand both the technical systems and the hazards associated with their operation, they create bespoke RAMDs for every plan. These documents identify foreseeable risks, evaluate their likelihood and impact, and define the control measures required to protect employees, contractors and building occupants.

Identical assets do not always present identical risks. Variations in location, access, environment or operational duty can significantly alter the risk profile. Where necessary, RAMDs are broken into discrete tasks or asset groups, ensuring that engineers receive guidance specific to the work in front of them—not generic paperwork that is easily overlooked.

Compliance and accountability are embedded into the workflow. Engineers must review the relevant RAMDs before attending site, with the date and time of each review recorded automatically in the Log-Book Portal for management oversight. This strengthens traceability, improves audit outcomes and demonstrates a transparent duty of care.

👉 Stage 7 – Procurement of Skills and Resources to Achieve Maintenance Objectives: click here to continue.